Engineers’ Rotation List (1995-1997)
Austin, Texas
Thonhoff Consulting Engineers performed five separate projects under this Rotation List Contract. The Austin Hills Park Hike and Bike Trail project involved designing a concrete bridge for pedestrian and emergency vehicle traffic. The Parker Lane 12-inch water line project entailed 3,200 linear feet of water line reconstruction followed by street reconstruction. The Boggy Creek Lift Station Improvements project incorporated the design of variable speed pumps in the Boggy Creek Lift Station for flow equalization control. The Shoal Creek Lift Station Improvements project involved construction of a new sloped flow surface for proper interior drainage. The Dessau Road 16-inch water line project entailed constructing 5,600 L.F. of water line to provide looped feed to the Walnut Creek Business Park.
Services Provided:
Preliminary Engineering, Environmental Permitting, Final Design Phase, Bid Phase, Construction Phase, and Warranty Phase Services.