Water System Rehabilitation within Doris Lane and Thompson Street
Cedar Park, Texas
The project involved installing approximately 2,900 L.F. of 8-inch PVC C900 water line within existing city streets. The project was designed to enable construction of the new line while keeping the existing undersized water lines in service. Once the new lines were constructed, the existing lines were abandoned in place. The City’s water system was looped using these improvements and fire protection was provided along the new line route. Pavement and driveway replacement was constructed along the pipeline trench.
Services Provided:
Preliminary Engineering Report, Final Design Phase, Bid Phase, Construction Phase, and Warranty Phase Assistance.