Comanche Wastewater Lift Station Relief Interceptor
Harker Heights, Texas
Construction of the relief interceptor enabled the Comanche Lift Station to divert wastewater flows from the existing Comanche Lift Station and convey these flows to the existing Fawn Valley/Evergreen Lift Station. The Comanche Lift station was subsequently abandoned and demolished. Major construction items included:
- -Construction of 519 LF of 10-inch gravity sewer
- -Construction of 1,641 LF of 15-inch gravity sewer
- -F.M. 2410 boring of 101.5 LF with 24-inch steel casing
- -Connection to wetwell of existing Evergreen/Fawn Valley Lift Station
- -Demolition of existing Comanche Lift Station
Services Provided: Preliminary Engineering Report, Design Phase Services, Bid Phase Services, and Construction Phase Services.