Wastewater System Improvements
Falls City, Texas
Thonhoff Consulting Engineers constructed improvements to the wastewater treatment plant and approximately 465 LF of new 10-inch PVC main trunk line in Falls City. Improvements to the WWTP included sludge dredging, new influent distribution piping, and an effluent irrigation pumping system. The effluent irrigation pumping system utilized a vertical turbine pump installed in a concrete vault in the final pond. Effluent was distributed by permanent PVC piping connected to fixed irrigation sets. Portable “Big-Gun” spray nozzles were used to distribute effluent to areas of the irrigation field.
Services Provided:
Preliminary Engineering, Design, Bid and Construction Phase Services.