City of Gonzales 1.5 Million Gallon Standpipe Exterior Painting Project


This project included approximately 6,600 L.F. of 24-inch transmission line and 15,100 LF of 16-inch transmission line for the City of Gonzales, Texas. Thonhoff Consulting Engineers designed the transmission main to be integrated into a pressure zone area that included a high service pump station, water treatment plant and water standpipe. The 2.5 MG water standpipe was also constructed during this contract.

Services Provided: Preliminary Engineering, Design Phase, Bid Phase, and Construction Phase Services.