Live Oak County, Old Marbach School WSC, Hideaway Hills Colonia Water System Improvements

This project entailed construction of a new water system for a colonia development along Lake Corpus Christi where residents and visitors participate extensively in lake recreation and fishing activities. The project included a 130-foot-deep new water well of capable of delivering a minimum of 125 gpm; a 30,000 gallon capacity ground storage tank; a hydropneumatic pump station with a pressure tank of 2,500 gallons, and two high service pumps each rated at 125 gpm. The water plant site included a new pump station building and chlorination facilities. The water distribution system consists of 270 L.F. of 6-inch and 5,620 L.F. of 4-inch water line. The water system serves 65 connections and is rated for 125 total connections.

Services Provided: Preliminary Engineering Report, Final Design Phase Services, Bid Phase Services, Construction Phase Services, and Warranty Phase Services.